The industrial complex of Esbea The industrial complex of Qasr Ben Ghashir The industrial complex of Tajura
   

The industrial complex of Gharian

It was established in 1987 on area of 150 hectares at Alrabata region far from Tripoli with 70 km including number of the largest workshops in north Africa in the field of minerals formation for cutting, bending and welding and other activities by huge machines with high capacities of about 20 m length and 110 mm thickness. In the field of flame cutting the capacity reaches 11 m length and 12 mm thickness as well as the bending machines for rolling sheets up 3.2 m length and 25 mm thickness for the circular drums.

In addition, the workshop is provided with cutting machines for plasma and there are five kinds of welding Arc – MIU – TIG- Sport and the submarine welding
The workshop is provided with great number of mobile high lifts of 5 to  480 tons. The workshop produces the light  and heavy industries.

There is line for rebuilding and maintenance of chain with presses and submarine welding machine and all tools of dismounting and installation.

 
Pipes making line

there is automatic line for producing the metal pipes by bending and cold rolled formation with diameters from 1 in to 1.25 – 1.50 and 2 inc with thickness of 2 mm. this line can produce carbon steel pipes and stainless steel pipes as well as the aluminum and copper pipes with capacity of 250 tons per year.

 
The mechanical works

The complex includes mechanical workshop, which specialize in many disciplines related to operations such as mechanical cutting and drilling, turning, milling and other delicate items include workshop where a large number of machines turning up to 5 meters in length and up-country on 3-meter workshop also provided a large number of drills Multiple warheads and milling machines are programmed and machining (CNC) for small and large sizes.

 
Plumbing and lamination:
First plumbing:
The compound includes the plumbing shop, where metal workshop provided the handwriting Plumbing opportunity poured into the cast iron and steel lines by casting him:
  • The first devoted to the cast iron production capacity of 350 template sandy / pm
  • Second dedicated to iron steel production capacity of 250 template sandy / pm

It contains workshop on a number of smelting furnaces 4 system to urge self-two of them and a capacity of 16 tons capacity, including two 8 tons and there are workshop furnace molten conservation and storage capacity of up to 45 tons.

Templates are prepared sand and placed on the line of plumbing machine is also pouring in molten stereotypes by casting the automated system to emerge from the conduct of mobile products.

The varying proportions of sand where stereotypes related to the 60 cm × 48 cm × 350 cm.
The workshop also contains a section modeling and the processing of sand and unit testing, as well as the final finishing and painting

 
Second lamination:
The complex includes a workshop for plumbing and methods of steel where there is this workshop furnace smelting capacity of the system of the arch 4.6 tons and is poured molten in the templates to form blocks to identify several of these blocs is heating furnaces in particular to a certain temperature and then begin the process of lamination by large pneumatic hammers to begin production of iron bars Its countries from 20 mm to 40 mm and lengths of up to 3 meters and is used in the manufacture of rails pieces and parts for regular and reach production capacity of this workshop to 5000 tons per annum in addition to a special furnaces and thermal treatment
 
Professional services:

The compound contains a set of functional units that provide the workshop production of energy needed for production in the form of:

  • Number 5 wells aquifer production capacity of 90 m 3 / h
  • Water treatment plant reverse osmosis system a capacity of 210 m 3 / h
  • Plant to produce liquefied gas capacity of 50 m 3 / h
  • Generating station, where compressed air containing 3 generators throughput capacity in 1590 3 / hour
  • Station electricity distribution capacity (15 megawatts) and 3 lines by 11 kilo volt power and the number (2) electrical transformer
  • Station cooling water capacity of 200 m 3 / h
  • Station for the distribution of liquefied propane gas storage capacity of 110 tons
  • There are complex and workshop for general maintenance of mechanical, electrical and electronic
  • In addition to the firefighting units and early warning related to most complex Workshop
  • As well as the complex is three major stores a total area of 13,000 square meters particularly raw materials and operating requirements as well as the store is dedicated to producing the ultimate levers with upper and optimum means of handling.
 
Gas cylinders Factory
It is a specialized plant for producing gas cylinders, according to the latest specifications established globally, factory will produce different messenger CDs include:
A cylinder capacity of 5 liters - the weight of 2 kg.
A cylinder capacity of 26.5 liters - the weight of 11 kg.
A cylinder capacity of 37.5 liters - the weight of 15 kg.
The production capacity of the plant 145000 cylinders annually during a rosy one job, and ensures a group of factory production units include:
  • Unit Parts: where are the individual and spare Scrolls weighing up to 10 tons after platelets to the unity and compromise amendment to cut the cylinder body and attachments.
  • Unit clouds deep: it is an individual and spare Scrolls, which is weighing the formation of the body where the cylinder with various sizes and capacities.
  • Unit Parts and storage: where they are cut and the bottom of the cylinder body.
  • Unit bending and fitting: where is the formation of the cylinder body accessories.
  • Units numbering: they are numbered and a trademark of the drum.
  • Welding units: Unit include washing and drying unit welding neck valve unit welding accessories body cylinder unit welding cylinder body.
  • Finishing the final units: The heat treatment furnace and unit testing pressure and unit cleaning brilliant passes to forwards Edmondo rail unit in addition to painting and painting with zinc metal.
   
 